Inside the early
eighties and speaking generally, the only internal pipeline inspection was
either carried out by the sewer inspection companies, who will be inspecting
mostly dry sewer pipe(Underground
Sewer Pipe) sections over
brief distances; usually not exceeding 150m and who would stop when the pipe
became surcharged towards the point exactly where the camera would turn into
submerged along with the oil business support companies who would run
'intelligent pigs' although the oil pipes to assess weld integrity, pipe wall
thickness and situation to be able to assess pipeline longevity and secure
operating pressure.
At this time the
water businesses who were largely oblivious for the internal condition of their
pipelines, adits, aqueducts and tunnels have been starting to possess concerns
concerning the integrity of their assets, numerous of which had been
constructed for the duration of the Victorian era or much more recently inside
the early fifties and had never been inspected and had been unsuccessfully
trying to discover firms and/or gear that could carry out such surveys.
In some
situations they had been capable to de-water the pipelines(Water Supply
Pipes) and if big
sufficient diameter, they would send a confined space team in to carry out a
visual survey; such surveys were clearly fraught with prospective dangers, not
least of which included the danger of collapse, flooding along with the
accumulation of toxic gasses.
De-watering came
with its personal set of potential dangers for the structural integrity on the
concrete, tunnelled and brick constructed pipelines; in many situations, tiny
leaks produced by displaced joints, erosion and localised harm etc. enabled the
leaking water to seek out a path through the ground and more than quite a few
years, earth would be washed out from around the pipe, frequently resulting in large
water filled voids forming around the outside in the pipeline.
The newly
de-watered pipeline which would usually be partially reliant on the head of
water within the pipeline (wanting to push the walls out), to preserve its
structural integrity, could suddenly be subjected to numerous tons of water
outside in the pipeline (looking to push the walls in), producing localised
locations of external high stress, which would frequently lead to pipe failure
and localised collapse, causing subsidence in the ground above the pipeline
manifesting as holes inside the ground that would appear 'over-night'.
At around this
time there was an growing demand from the Water Firms to send divers up water
filled pipes(Tap Water Pipe) armed with CCTV cameras, to survey for as far as
their nerve or umbilical length would permit.
Within a really
short time period the HSE Diving Executive, showed a keen interest inside the
security aspect of sticking divers up pipes and ahead of extended an excursion
range of about 30m as a maximum was considered protected, delivering that all
the needed safety precautions were in place.