In the early
eighties and speaking typically, the only internal pipeline inspection was
either carried out by the sewer inspection businesses, who will be inspecting
primarily dry sewer pipe(Underground
Sewer Pipe) sections more
than brief distances; generally not exceeding 150m and who would quit when the
pipe became surcharged for the point where the camera would turn into submerged
along with the oil business assistance companies who would run 'intelligent
pigs' though the oil pipes to assess weld integrity, pipe wall thickness and
condition to be able to assess pipeline longevity and secure operating stress.
At this time the
water organizations who were largely oblivious to the internal situation of
their pipelines, adits, aqueducts and tunnels have been beginning to possess
concerns concerning the integrity of their assets, many of which had been
constructed during the Victorian era or much more lately inside the early
fifties and had never ever been inspected and had been unsuccessfully
attempting to locate firms and/or gear that could carry out such surveys.
In some circumstances
they were capable to de-water the pipelines(Water Supply
Pipes) and if massive
enough diameter, they would send a confined space group in to carry out a
visual survey; such surveys have been certainly fraught with potential dangers,
not least of which included the danger of collapse, flooding and also the
accumulation of toxic gasses.
De-watering came
with its personal set of prospective risks towards the structural integrity in
the concrete, tunnelled and brick constructed pipelines; in numerous
situations, small leaks produced by displaced joints, erosion and localised
damage etc. enabled the leaking water to seek out a path through the ground and
more than several years, earth could be washed out from around the pipe, often
resulting in huge water filled voids forming about the outdoors in the
pipeline.
The newly
de-watered pipeline which would frequently be partially reliant around the head
of water within the pipeline (looking to push the walls out), to keep its
structural integrity, could all of a sudden be subjected to numerous tons of
water outside in the pipeline (trying to push the walls in), generating
localised locations of external high pressure, which would often cause pipe
failure and localised collapse, causing subsidence from the ground above the
pipeline manifesting as holes within the ground that would seem 'over-night'.
At around this
time there was an escalating demand from the Water Organizations to send divers
up water filled pipes(Tap Water Pipe) armed with CCTV cameras, to survey for as far as
their nerve or umbilical length would permit.
Within an
incredibly short period of time the HSE Diving Executive, showed a keen
interest within the safety aspect of sticking divers up pipes and ahead of
extended an excursion array of around 30m as a maximum was considered secure,
delivering that all of the essential safety precautions were in spot.